<form id="q0ltb"><acronym id="q0ltb"></acronym></form>
    <pre id="q0ltb"></pre>
  • <em id="q0ltb"><tfoot id="q0ltb"><span id="q0ltb"></span></tfoot></em>

  • 
    
  • 国产免费va,91视频网址,亚洲AV永久青草无码性色av,波多野结衣午夜影院,jizzjizz亚洲,天天色天天射综合网,午夜不卡av免费,JIZZ亚洲
    MENU
    The reason for the insufficient suction of stone sucker

    Writer:     Date: 2021-08-21

    The reason for the insufficient suction of stone sucker, I will introduce to you. Because the heat capacity of semiconductor rectifier element is very small, when the rectifier is overloaded, the temperature of the element rises sharply and the diode is burned. Rectifier components will be aging, there will be a degenerative phenomenon, resulting in the output of the electric bed, so that the suction of the vacuum sucker is insufficient. The inductance of the force line device by dry vacuum suction cup is very large, which will produce a large overvoltage at the moment of disconnecting the coil and may break down the rectifier element. The gas consumption of the straight air generator is determined by the diameter of the working nozzle, but it is also related to the working pressure. With the same nozzle diameter, the air consumption increases with the increase of working pressure. The diameter of nozzle is the main basis for selecting vacuum generator. The larger the nozzle diameter, the larger the suction flow and gas consumption, and the lower the vacuum degree: the smaller the nozzle diameter, the smaller the suction flow and gas consumption, but the higher the vacuum degree. To change the tube base, first unscrew the 2 screws (with gaskets) on the side of the manifold base, replace the old manifold base with a new one, and then put the gasket on the screw, pay attention to the screw with equal force.

    In vacuum sensor, turn off the vacuum sensor on the side of 2 screws, and remove the vacuum sensor, then twist off vacuum sensor below the four screws (with washer), and then changed into a new vacuum sensor and put on the washer screw on the base of screw, will be in a good vacuum sensor installation back in vacuum, on the last point on the surface of the upper screw again: in silencer, First screw off the straight empty generator surface, remove the muffler, there is a relay pipe connection in the middle, and then remove the muffler below the 2 black nails, replace the old muffler with the new, screw the muffler base screw, install the relay pipe in the middle, and then reinstall the muffler, and then screw on the side screw.




    — Related news —

    Wechat QR Code

    No.8-1 Northern Jiefang East Road, Xichong Village, Lunjiao,Shunde District, Foshan City, Guangdong Province, China

    Tel: +86 0757 22818555

    Fax: +86 0757 22818555

    Copyright ? Guangdong Shunde Belino Machinery Co., Ltd. All Rights Reserved. 粵ICP備19106771號 Technical Support: BUDRAY.COM  VISIT DETAIL
    top 主站蜘蛛池模板: 伊人久久精品| 兴国县| 无码制服丝袜人妻在线视频精品| 久久精品人妻中文视频| 77777色| 久久伊人精品只有这里有| 九色导航| 亚州精品国产精品乱码不99按摩 | 75福利航导大全| 亚洲成人福利网站| 婷婷综合久久| 龙井市| 停停六综合| 成人午夜av在线播放| 中文字幕精品熟女| 九九国产| 国外啪啪呦女网站呦齿| 亚洲怡春院| 欧美精品99久久久| 日本亚洲成a人片在线观看| 高清国产美女一级毛片| 久草国产视频| 亚洲日韩AV无码专区影院| 夜夜嗨AV一区二区三区网页| 免费一级大毛片a一观看不卡| 国产56页| 日本精品中文字幕| 久久93精品国产91久久综合| 无码中文字幕国内视频| 手机看片日韩| 久久夜色撩人精品国产小说| 日韩无毛| 色姑娘综合网| 亚洲中文视频一区二区三区| 国产口爆| www.黄色| 国产不卡av一区二区| 日本三码电影在线| 成人福利视频| 国产亚洲精aa在线观看香蕉| 黑人牲交|